Commit d3e030a3 authored by Jürgen Reuter's avatar Jürgen Reuter
Browse files

First update to 3.0.0 alpha.

parent b45f0f7c
......@@ -2,7 +2,81 @@ ChangeLog -- Summary of changes to the WHIZARD package
Use svn log to see detailed changes.
Version 2.8.2
Version 3.0.0_alpha
2020-03-03
RELEASE: version 3.0.0_alpha
2020-02-25
Bugfix: Scale and alphas can be retrieved from internal event format to
external formats
2020-02-17
Bugfix: ?keep_failed_events now forces output of actual event data
Bugfix: particle-set reconstruction (rescanning events w/o radiation)
2020-01-28
Bugfix for left-over EPA parameter epa_e_max (replaced by epa_q_max)
2020-01-23
Bugfix for real components of NLO QCD 2->1 processes
2020-01-22
Bug fix: correct random number sequencing during parallel MPI event
generation with rng_stream
2020-01-21
Consistent distribution of events during parallel MPI event generation
2020-01-20
Bugfix for configure setup for automake v1.16+
2020-01-18
General SLHA parameter files for UFO models supported
2020-01-08
Bug fix: correctly register RECOLA processes with flavor sums
2019-12-19
Support for UFO customized propagators
O'Mega unit tests for fermion-number violating interactions
2019-12-10
For distribution building: check for graphviz/dot
version 2.40 or newer
2019-11-21
Bug fix: alternate setups now work correctly
Infrastructure for accessing alpha_QED event-by-event
Guard against tiny numbers that break ASCII event output
Enable inverse hyperbolic functions as SINDARIN observables
Remove old compiler bug workarounds
2019-11-20
Allow quoted -e argument, implemented -f option
2019-11-19
Bug fix: resonance histories now work also with UFO models
Fix in numerical precision of ASCII VAMP2 grids
2019-11-06
Add squared matrix elements to the LCIO event header
2019-11-05
Do not include RNG state in MD5 sum for CIRCE1/2
2019-11-04
Full CIRCE2 ILC 250 and 500 GeV beam spectra added
Minor update on LCIO event header information
2019-10-30
NLO QCD for final states completed
When using Openloops, v2.1.1+ mandatory
2019-10-25
Binary grid files for VAMP2 integrator
##################################################################
2019-10-24
RELEASE: version 2.8.2
......
<?xml version="1.0" encoding="ISO-8859-1"?>
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.1//EN" "http://www.w3.org/TR/xhtml11/DTD/xhtml11.dtd">
<html xmlns="http://www.w3.org/1999/xhtml" xml:lang="en">
<head>
<title>WHIZARD Internal Information</title>
<link href="/whizard.css" rel="stylesheet" type="text/css" />
</head>
<body>
<p>
<a href="../index.html"><img src ="../symbols/contents_motif.gif" alt="Up" /></a>
</p>
<hr />
<h1>INTERNAL WHIZARD INFORMATION</h1>
<li><a href="meetings.html"><b>1 Minutes of WHIZARD meetings</b></a></li>
<li><a href="workshoptalks.html"><b>2 Upcoming events/meetings</b></a></li>
<li><a href="summiesinternals.html"><b>3 Summer students reports and Internal documents</b></a></li>
<hr />
<hr />
This WWW page is brought to you by
<a href="http://www.tp1.physik.uni-siegen.de/staff/index.php">Wolfgang Kilian</a>,
<a href="http://www.desy.de/~reuter/">J&uuml;rgen Reuter</a>,
<a href="http://theorie.physik.uni-wuerzburg.de/~ohl/">Thorsten
Ohl</a>.
<hr />
<p>$Id: Internal/index.html 212 2012-03-19 16:19:46Z jr_reuter $</p>
</body>
</html>
<?xml version="1.0" encoding="ISO-8859-1"?>
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.1//EN" "http://www.w3.org/TR/xhtml11/DTD/xhtml11.dtd">
<html xmlns="http://www.w3.org/1999/xhtml" xml:lang="en">
<head>
<title>WHIZARD Internal Information</title>
<link href="whizard.css" rel="stylesheet" type="text/css" />
</head>
<body>
<p>
<a href="index.html"><img src ="../symbols/contents_motif.gif" alt="Up" /></a>
<a href="workshoptalks.html"><img src="../symbols/next_motif.gif" alt="Next"></a>
</p>
<hr />
<h1>INTERNAL WHIZARD INFORMATION</h1>
<h2><b>1) PAST WHIZARD WORKSHOPS AND MEETINGS </b></h2 >
<UL>
<h3> 2018 </h3>
<li>
WHIZARD meeting, 30.-31.1.2018, DESY,
Attendants: Brass,Kilian,Reuter,Rothe,Stienemeier:
status of VBScan project: integration problems VAMP2, shower problem
(later color-flow bug); status NLO: listing of strategies for checks;
future project plans; plan of technical phase for WK's stay at CERN.
New compiler bugs and possible workarounds.
<h3> 2017 </h3>
<li>
WHIZARD meeting, 20.-24.11.2017, main day: 23.11., Siegen,
Attendants: Brass,Kilian,Ohl,Reuter,Rothe,Sekulla,Stienemeier,Utsch,Zhao:
major discussion points: status of NLO, ee->jjj, phase space issues in
VBS (cost network), status of UFO support and general Lorentz structures,
multi-Higgs couplings in 5- and 6-point vertices, master reverting fix
after wrong merge of dim-8 transversal branch (remote farewell to
Christian IV), status of fast_wood phase space; decision to get rid of
.eps files for documentation and only support pdflatex; importance of
combined integration and efforts to get this to run for the top threshold;
NLO EW unfortunately stalled for the moment until (almost) complete
NLO QCD validation
<li>
WHIZARD meeting, 23.-25.7.2017, W&uuml;rzburg,
Attendants: Brass,Chokoufe,Kilian,Ohl,Reuter,Rothe,
Speckner,Sekulla,Stienemeier,Utsch,Weiss,Zhao (Fleper ill):
Farewell to Bijan and Christian III.: huge hand-over of knowledge
of FKS/NLO/radiation generator/scripting/threshold/POWHEG/matching,
exhaustive discussion of all tickets and issues particularly w.r.t.
NLO topics, status of VBS dim-8 project; O'Mega problem with OCaml
4.05.0; how and when to repair broken RECOLA interface; NLO comparison
with MG5; NLO QCD processes for hadron collisions; decision to start
a draft for an NLO write-up
<li>
WHIZARD meeting, 20.-21.3.2017, DESY,
Attendants: Brass,Chokoufe,Fleper,Kilian,Ohl,Reuter,Rothe,Schwinn,
Stienemeier,Weiss,Zhao: status of NLO, workshop planning, distribution of work
for the final time of BACN and CW, status of VAMP2, cleanup of issues on GIT, i.e.
moving long-term issues to tickets on HepForge;
attached LC Generator Meeting: notes on the internal Gitlab Wiki Page.
<li>
WHIZARD meeting, 9.-11.1.2017, Siegen, Attendants:
Brass,Chokoufe,Fleper,Kilian,Reuter,Rothe,Sekulla,Weiss,Zhao;
Status of NLO: missing pieces for validation, tasks for new people:
VR will do EW subtraction, CF will do matching to structure functions,
SB might take over matching for final state multi-jets etc.; SB: status
of new RNG/VAMP, plans for implementing the parallel version; LC generator
group issues: LCIO tasks done, plan for resonance-aware shower initialization
(WK will take this over). Slow progress on UFO, hope to have tutoralizable
versions for the India event or at least for MC4BSM 2017. New plans for
generating the phase-space setup (M. Utsch). New release probably end of
March for the Indian event. Time schedule for defenses and handing over
responsibilities.
<h3> 2016 </h3>
<li>
WHIZARD meeting, 20.-21.9.2016, W&uuml;rzburg, Attendants:
Brass,Chokoufe,Fleper,Kilian,Ohl,Reuter,Speckner,Weiss,Zhao;
Restructuring configure setups: only one configure, no more subpackage,
shell script projector to generate subpackages; major work plan change:
move from HepForge svn to gitlab at Siegen, move git branches from DESY stash
and from W&uuml;rzburg git to Siegen repo, protected master branch with merge requests
only, svn commit automatically from git master, testing by gitlab tools using docker to
prepare compiler installations; establish Slack as work chat and for short-term issues;
user code routines/interfaces to be discussed at LC Generator Group meeting in 12/2016;
status of MPI: new VAMP(2) implementation will come as alternative integrator, probably
directly as sub-module of WHIZARD, most of TO's code rewritten by SB, final tests
still pending; NLO refactoring close to finalized, will be merged as soon as possible,
will trigger new release to be 2.4.0, scheduled for 28.11.2016; WK promised to take
over recent bugs (phase space problem, NAG error messages etc.); work distribution
for NLO: top threshold highest priority (incl. factorized NLO decays), ZZ taking over
hadron collider NLO, CF will start with automation of EW NLO; Status of UFO support:
TO gives schedule for mid-October to have SM from UFO working in full WHIZARD, incl.
WHIZARD phase space and model parameter files, further testing can be done also by other
WHIZARDs; separate discussion on TO's restrictions on propagators and vertices
(TO/CF/MS); more intense discussions of shower and matching postponed; validation
of ILC cross sections: ZZ will rerun numbers from Sherpa/Helac paper, then run
Sherpa and MG5 for further comparison, afterwards start with LHC processes
</li>
<li>
WHIZARD meeting, 7.-9.6.2016, DESY, Attendants:
Brass,Chokoufe,Kilian,Ohl,Reuter,Shim,Weiss,Zhao. status of NLO: missing pieces, next steps,
technical details of refactoring to allow for several subtraction schemes (like CS vs. FKS).
Importance of seed kinematics: born vs. real (n vs. n+1), schedule for NLO refactoring (regarding
release plans) and work distribution (WK+CW); discussion on the shower performance, interpolating grids
for Sudakov evaluation, technical details of our Sudakov integral, Preparation for possible EW corrections:
research plan for PhD of CFleper; plans for other OLPs like NJet and RECOLA; discussion on DESY summer student
projects; work on matching will be continued after top continuum and threshold
projects are finished; preparations for MC4BSM and new tutorial: use of Docker, at certain point revival
of GUI, Plans on help functions and automatic SINDARIN reference. Status of UFO parser, prospects for
validation and schedule for inclusion in official release: most likely for a 2.4.0 and not in 2.3.0.
Discussion of LC Generator Group issues: list of possible causes for discrepancy in hadronic particle counts
between 1.95_LC_GenG and 2.3.0_alpha_inoff. Beam spectra, open points on correlated tau decays.
Report from SBrass on status of VA-MPI-RE and MPI parallelization plans for WHIZARD. Discussion on
parallelization and merging of integration grids. Open points for merging with trunk (understanding
of errors). Meeting followed by CWeiss+ZZhao closed session on NLO at hadron colliders.
</li>
<li>
WHIZARD meeting, 17.-18.2.2016, Siegen, Attendants:
Brass,Chokoufe,Fleper,Kilian,Ohl,Reuter,Sekulla,Weiss,Zhao: authentication to Jenkins via
public keys, clean-up of Jenkins tasks; tau decays: inclusion of Tauola (quasi-final Fortran
version of the code) to allow the LC generator group to do backwards validation; Bloch spheres for
spin representations, JRR finds write-up and sends it around; wrap-up of NLO status: missing pieces
are hadron collider singular regions and validation, resonance histories for subtraction terms,
priority for finalization of top threshold and tth NLO QCD papers; electroweak scheme support by
WK; Zhao: 2->6, 2->8 validation, participation in NLO validation and development; new class of restrictions for O'Mega
amplitudes for excluding certain vertices or propagators; stressing of the importance of UFO support
and generalized Lorentz structures, plan to be ready for MC4BSM 2016 mid July 2016; plans for
conference coverage; preparation of summer student projects; discussion on parallelization: priority
for the MPI inside VAMP; welcome to new team members Zhao and Fleper. 3rd International WHIZARD forum
planned for spring 2018, possibly in castle around Siegen or mid-Rhine valley.
</li>
<h3> 2015 </h3>
<li>
WHIZARD meeting, 24.-25.11.2015, W&uuml;rzburg, Attendants:
Brass,Chokoufe,Kilian,Ohl,Reuter,Weiss: revision of HepForge ticket policies,
big overhaul of Jenkins server in Siegen, plan for update of OS to modern Debian,
update to newest Jenkins version, plan for revision of Jenkins jobs; personnel
evaluation and project distribution; new phase with more papers and (hopefully) less technical
development. Prioritization in O'Mega development for general Lorentz structure and
UFO support, plus counting coupling constants. Performance improvements later.
Discussion on status of tau polarization and interface to Tauola vs. intrinsic
tau decay module.
</li>
<li>
WHIZARD meeting, 31.8.-1.9.2015, DESY, Attendants: Chokoufe,Kilian,
Ohl,Reuter,Shim,Weiss; revision of continuous integration and staging,
introduction of DESY Atlassian tools (Kanban board and Stash), (a lot of)
progress on the top threshold, setup for NLO/processes refactoring (minor
until end of 2015), ranking of next priorities.
</li>
<li>
WHIZARD meeting, 1.-2.6.2015, Siegen, Attendants:
Chokoufe,Kilian,Reuter,Sekulla,Shim,Weiss; discussion of dim. 6 operator
inclusion, strategy for NLO and matching/merging.
</li>
<li>
WHIZARD workshop and meeting, 16.-20.3.2015, W&uuml;rzburg, Attendants:
Bach,Chokoufe,Kilian,Ohl,Reuter,Sekulla,Speckner,Weiss; gigantic reduction
of tracker tickets by streamlining planned projects, new method for amplitudes
with tagged/dressed nodes in the DAG, distribution of top threshold project,
farewell to Fabian Bach. Next big steps: SINDARIN revision, NLO automation,
matching.
</li>
<li>
WHIZARD meeting, 15.-16.1.2015, DESY, Attendants:
Bach,Chokoufe,Kilian,Reuter,Sekulla,Weiss; preparations
WHIZARD workshop, strategic discussions NLO, shower and matching,
plans for versions 2.2 and 2.3, personnel planning: good news
from Siegen, workshop attendance planning in 2015.
</li>
<h3> 2014 </h3>
<li>
WHIZARD meeting, 12.-14.11.2014, W&uuml;rzburg, Attendants:
Bach,Chokoufe,Kilian,Ohl,Reuter,Sekulla,Speckner,Weiss; staging of OVM
into release, OVM paper, setting contents and date for 2.2.3
release (beta version tt threshold, LCIO if ready, OVM),
preparations WHIZARD workshop, strategy shower, QCD, Pythia 8
interface, discussion of model file syntax and general Lorentz
structures
</li>
<li>
WHIZARD meeting, 14.-16.7.2014, Siegen, Attendants:
Bach,Chokoufe,Kilian,Ohl,Reuter,Sekulla,Weiss; extensive
(re)-ordering and prioritizing of tickets and projects; afternoon
on parallelization and joint projects with engineering department;
schedule for NLO projects (Chinese WS, TOP, LCWS etc.); plans
for the WHIZARD Forum in 03/2015.
</li>
<li>
WHIZARD meeting, 30.3.-1.4.2014, DESY, Attendants:
Bach,Chokoufe,Kilian,Ohl,Reuter,Sekulla,Weiss; third
(and last) big technical pit stop for 2.2.0, definite planning of the
last release steps, coordinating the follow-up steps. Possible
solution for guinea-pig plug-in. Planning
for the WHIZARD Forum: date and place fixed.
</li>
<li>
WHIZARD meeting, 19.-21.2.2014, W&uuml;rzburg, Attendants:
Bach,Kilian,Ohl,Reuter,Sekulla; second big pit stop for 2.2.0
preparations, finalization of model setup for 2.2.0, handling
of beam spectra incl. structure function mapping, access to
ILC TDR and newest CLIC spectra. Listing of final steps for
2.2.0 release. Planning for WHIZARD workshop.
</li>
<h3> 2013 </h3>
<li>
WHIZARD meeting, 3.-5.12.2013, Siegen, Attendants:
Bach,Kilian,Ohl,Reuter,Sekulla,Weiss; big pit stop
for 2.2.0 preparations, many technical details. Projects
for PhDs: NLO POWHEG and dipole subtraction, shower and
radiation off massive particles, DFG grant planning,
beam setup for LC, schedule for releases, planning of
a WHIZARD workshop. Counting orders in amplitudes.
</li>
<li>
WHIZARD meeting, 7./8.10.2013, DESY, Attendants:
Bach,Kilian,Ohl,Reuter; meetings with Richard/Poeschl on
ILC issues, with Plaetzer on Matchbox/Herwig interfaces,
with Prestel on event formats and Pythia interfaces. Global vs. local data,
SINDARIN plans, O'Mega Lorentz structures and coupling order,
strategic planning of group work and funding applications,
timetable for final 2.2.0 release steps.
</li>
<li>
WHIZARD meeting, 11./12.7.2013, W&uuml;rzburg,
Attendants: Bach,Chokoufe,Kilian,Ohl,Reuter,Speckner,Staub;
Topics: Refactoring, preparation for v2.2.0, strategy
for FeynRules, UFO file format parser, MC over helicities,
personnel, main architecture, kinds precision definitions,
color and gluon amplitudes, plans for NLO.
</li>
<li>
WHIZARD meeting, 15./16.5.2013, Siegen,
Attendants: Bach,Kilian,Ohl,Reuter,Sekulla; Topics:
preparation and steps for v2.2.0, generalized Lorentz
and color structures, syntax for inclusive processes
and decays, EW physics and unitarization, strategy
plans and personnel.
</li>
<li>
WHIZARD meeting, 13./14.2.2013, DESY,
Attendants: Bach,Kilian,Ohl,Reuter,Sekulla, Topics:
Jenkins configuration, color flows, epsilon tensor
structures, LCIO event format (F. Gaede), personnel
(summer student and masters projects), plans on
object oriented code, 2.1.2+ versions until
OO code is ready, editor mode configuration.
</li>
<h3> 2012 </h3>
<li>
WHIZARD Meeting, 25.-27.11.2012, W&uuml;rzburg,
Attendants: Kilian,Ohl,Reuter,Speckner, Topics:
Strategy, Grant Applications, Core modifications,
Jenkins, Connections via sockets, O'Mega: coupling
restrictions and Lorentz structures
</li>
<li>
WHIZARD Meeting, 30./31.8.2012, Siegen,
Attendants: Kilian,Ohl,Reuter,Schmidt,Speckner
</li>
</UL>
<hr/>
<hr />
This WWW page is brought to you by
<a href="http://www.tp1.physik.uni-siegen.de/staff/index.php">Wolfgang Kilian</a>,
<a href="http://www.desy.de/~reuter/">J&uuml;rgen Reuter</a>,
<a href="http://theorie.physik.uni-wuerzburg.de/~ohl/">Thorsten
Ohl</a>.
<hr />
</body>
</html>
<?xml version="1.0" encoding="ISO-8859-1"?>
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.1//EN" "http://www.w3.org/TR/xhtml11/DTD/xhtml11.dtd">
<html xmlns="http://www.w3.org/1999/xhtml" xml:lang="en">
<head>
<title>WHIZARD Internal Information</title>
<link href="whizard.css" rel="stylesheet" type="text/css" />
</head>
<body>
<p>
<a href="workshoptalks.html"><img src="../symbols/previous_motif.gif" alt="Previous"></a>
<a href="index.html"><img src="../symbols/contents_motif.gif" alt="Up"></a>
<a href="projects.html"><img src="../symbols/next_motif.gif" alt="Next"></a>
</p>
<hr />
<h2>3) SUMMER STUDENT REPORTS AND INTERNAL DOCUMENTS </h2>
<p></p>
<h2>DESY Summer student reports</h2>
<ul>
<li>
<b>2017</b>, Felix Tellander, <a href="Report_Summer2017_FelixTellander.pdf"> Validation of NLO QCD for lepton collisions </a>
</li>
<li>
<b>2016</b>, Anton Motornenko, <a href="Report_Summer2016_AntonMotornenko.pdf"> NLO computations with RECOLA in WHIZARD event generator </a>
</li>
<li>
<b>2016</b>, Hubert Milczarek, <a href="Report_Summer2016_HubertMilczarek.pdf"> Studying the process ee -> tt at LO, NLO and with POWHEG matching with WHIZARD </a>
</li>
<li>
<b>2015</b>, Fernando Romero Lopez, <a href="Report_Summer2015_FernandoRomeroLopez.pdf"> Validating WHIZARD and OpenLoops</a>
</li>
</ul>
</body>
</html>
<?xml version="1.0" encoding="ISO-8859-1"?>
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.1//EN" "http://www.w3.org/TR/xhtml11/DTD/xhtml11.dtd">
<html xmlns="http://www.w3.org/1999/xhtml" xml:lang="en">
<head>
<title>WHIZARD Internal Information</title>
<link href="whizard.css" rel="stylesheet" type="text/css" />
</head>
<body>
<p>
<a href="meetings.html"><img src="../symbols/previous_motif.gif" alt="Previous"></a>
<a href="index.html"><img src="../symbols/contents_motif.gif" alt="Up"></a>
<a href="summiesinternals.html"><img src="../symbols/next_motif.gif" alt="Next"></a>
</p>
<hr />
<h1>INTERNAL WHIZARD INFORMATION</h1>
<h2>2) UPCOMING EVENTS/MEETINGS</h2>
<UL>
<h3> 2019 </h3>
<li>
3rd WHIZARD Forum, 16.-20.9.2019, CERN [all]
</li>
<li>
RADCOR 2019, 8.-13.9.2019, Avignon [?]
</li>
<li>
Lepton Photon, 5.-10.8.2019, Toronto [--]
</li>
<li>
DPG Spring Meeting, 25.-29.3.2019, RWTH Aachen [?]
</li>
<li>
ACAT 2019, 11.-15.3.2019, Saas Fee [SB?]
</li>
<li>
CLIC Workshop, 21.-25.1.2019, CERN [?]
</li>
<h3> 2018 </h3>
<li>
Annual Terascale Workshop 2018, 26.-28.11., DESY [JRR/VR/PS/?]
</li>
<li>
LCWS 2018, 22.-26.10.2018, Arlington, USA [JRR]
</li>
<li>
WHIZARD Meeting, 15.-16.10.2018, W&uuml;rzburg [all]
</li>
<li>
DESY Theory Workshop, 25.-28.9.2018, DESY (JRR/VR/??)
</li>
<li>
Maria Laach, 9.2018, Maria Laach [TO]
</li>
<li>
Physics in Collision 2018, 11.-15.9.2018, Bogota, Colombia [--]
</li>
<li>
MBI 2018, 29.-31.8.2018, Ann Arbor, USA [JRR]
</li>
<hr/>
<p></p>
<hr />
This WWW page is brought to you by
<a href="http://www.tp1.physik.uni-siegen.de/staff/index.php">Wolfgang Kilian</a>,
<a href="http://www.desy.de/~reuter/">J&uuml;rgen Reuter</a>,
<a href="http://theorie.physik.uni-wuerzburg.de/~ohl/">Thorsten
Ohl</a>.
</body>
</html>
......@@ -46,12 +46,13 @@ href="http://gcc.gnu.org/fortran/">http://gcc.gnu.org/fortran/</a>
<p>Regressions:</p>
Due to severe regressions, gfortran 6.5.0 cannot be used (6.4.0 is fine), and also
Intel ifort 19.0.0, 19.0.1 and 19.0.2 show a limited regression.
Intel ifort 19.0.0, 19.0.1 and 19.0.2 show limited regressions.
<p>Compilers that might work in the far future:
<p>Compilers that are not complete F2003 compilers and do not work (but might work
in a very distant future):
</p>
<ul>
<li>PG Fortran (commercial; Portland Group; version > 19.9)
<li>PG Fortran (commercial; Portland Group; version > 20.1)
<a href="http://www.pgroup.com/">http://www.pgroup.com/</a>
has some F2003/08 features implemented already, but the backend of the compiler
is too buggy to be seriously used.
......
......@@ -23,10 +23,12 @@
</ul>
<p></p>
</li>
<li><b>REPOSITORY, BUG TRACKER</b>
<li><b>REPOSITORY, LAUNCHPAD, BUG TRACKER</b>
<ul>
<li><a href="https://launchpad.net/whizard">Launchpad Support Page</a></li>
<li><a href="https://phab.hepforge.org/diffusion/WHIZARDSVN">Subversion Repository</a></li>
<li><a href="/trac/report">Bug Tracker</a></li>
<li><a href="https://answers.launchpad.net/whizard">Support Questions</a></li>
<li><a href="https://bugs.launchpad.net/whizard">Bug Tracker</a></li>
</ul>
<p></p>
</li>
......@@ -63,6 +65,7 @@
</li>
<li><b>CONTACT</b>
<ul>
<li><a href="https://launchpad.net/whizard">Launchpad Support Page</a></li>
<li><a href="mailto:whizard@desy.de">Contact us</a>
<p></p>
</li>
......
......@@ -70,16 +70,19 @@
<p>
<b>
<span style="color:blue">
The official version is 2.8.2. (released:
October 24th, 2019.)
The official versions are 2.8.2 (released:
October 24th, 2019) and 3.0.0&alpha;
(released March 3rd, 2020).
</span>
</b>
</br>
<br/>
<br/>
The distribution tarball of the
The distribution tarballs of the
sources can be found here
(<a href="http://whizard.hepforge.org/whizard-2.8.2.tar.gz">link</a>).
(<a href="http://whizard.hepforge.org/whizard-2.8.2.tar.gz">2.8.2, link</a>)
and
(<a href="http://whizard.hepforge.org/whizard-3.0.0_alpha.tar.gz">3.0.0&alpha;, link</a>).
<br/>
</p>
</li>
......@@ -102,8 +105,8 @@
<li CLASS="li-itemize">
<p>
<b> The manual for WHIZARD 2 </b> is not yet completed. We
regularly update the version from the distributions (last update: 2019-10-24).
<b> The manual for WHIZARD 3 </b> is not yet completed. We
regularly update the version from the distributions (last update: 2020-03-03).
The manual is available as PDF (<a href="manual.pdf">link</a>) and HTML
(<a href="manual">link</a>).
You can find a few physics examples in the
......@@ -239,8 +242,10 @@
</p>